Insights Havant Thicket Reservoir
The proposed reservoir and pipeline will provide improved resilience for existing Portsmouth Water customers, support additional housing growth in the Portsmouth Water supply area and enable additional water to be supplied to Southern Water to meet its forecast deficit.
Complementary to its infrastructure resilience function, the reservoir will provide a new recreational resource in South Hampshire which will include a visitor centre with education facilities, accessible open space, a network of trails linking to the wider area and a new wetland habitat and associated area for nature conservation. Opportunities for local employment will be maximised during the reservoir’s construction, as well as the development of skills locally to leave a positive legacy in the local communities.
We prepared and submitted three successful outline planning applications (under the Town and Country Planning Act) in Autumn 2020, the reservoir and pipeline applications were supported by one overarching Environmental Statement, Transport Assessment, Flood Risk Assessment and a Biodiversity Mitigation and Compensation Strategy. We are also providing a Design Guardian role to support Portsmouth Water and the contractor during construction.
Public consultation
screen reader title
50k
Households received awareness postcards
1.25k
Feedback forms submitted
80%
of respondents confirmed that they supported our plans for the reservoir.
Environmentally-led design
screen reader title
50k
Households received awareness postcards
1.25k
Feedback forms submitted
80%
of respondents confirmed that they supported our plans for the reservoir.
The reservoir site has complex environmental issues including areas of ancient woodland and protected species including Bechstein’s bats. It also contains part of a conservation area and a grade II* registered park and garden, Staunton country park.
The design of the reservoir was environmentally-led and integrated the operational and visitor facilities within the landscape to provide an attractive setting for the scheme, minimise its visual and environmental impact and maintain the rural character of the site. The design reflects the history of the landscape and pays tribute to the ‘lost’ parts of the landscape. The proposed staircase to the top of the embankment celebrates the interface between the reservoir and Staunton country park with views across the water to the visitor centre and wetlands. The variation in slope gradient and planting proposed will also give the embankment a natural appearance in keeping with the park.
A 5km pipeline will transfer water from Bedhampton Springs to fill the reservoir in the winter and draw it off to treat and supply when needed in the summer. The development includes the pipe, an emergency discharge structure and upgrades to existing culverts. The pipeline will be routed through residential areas and was the result of substantial optioneering to ensure disruption to communities and environmentally sensitive areas was minimised as far as possible.
Connecting with communities
Plans for a full-scale public consultation in May 2020, centred around a series of public exhibitions, were well underway when COVID-19 hit. The situation and subsequent government measures made the planned ‘face-to-face’ approach impossible, but with a planning application that had to be submitted that Autumn and a mail-drop artwork deadline looming, the project team had to quickly adapt and develop a fully remote, digital approach, and sign it off with the local planning authority within a couple of weeks. Working closely with Portsmouth Water and their communications team, plans were revised to include the following activities:
-
Spreading the word: working harder to raise awareness with a postcard drop to 50,000 households; promoting the consultation in the local media, promotion through partner websites/newsletters – local council; community organisations and parish councils and direct emails to an extensive stakeholder database and reservoir newsletter list.
- Creating a suite of flexible print and digital materials: including a 24-page consultation brochure; a 3D visualisation film; and a series of video podcasts, interviewing different project team experts.
- Developing an interactive, virtual exhibition: housing all the materials and capturing feedback through a questionnaire, comments and ideas boxes and an interactive map.
-
Using technology to answer questions: through a series of public, stakeholder and staff webinars, presenting our proposals and answering questions via a live Q&A; and taking questions through social media and telephone.
-
Creating different ways to feedback: through the microsite and social media profiles, but also using a physical feedback form with a freepost return envelope, posted to 1,250 neighbours.
A guiding principle for the community engagement was accessibility, ensuring that materials presented the proposals, the issues and the options in a clear and engaging way. This focused on accessible, visual materials; but also on face-to-face events, giving the public an opportunity to meet the team virtually and ask questions.
For many, this was a convenient and flexible way to engage with the project, but it was critical to provide options for those who couldn’t or would prefer not to use computers. A dedicated project answerphone was also setup, where people could leave feedback, submit questions and request printed copies of the consultation brochure and feedback form, sent with a freepost return envelope.
In the absence of public exhibitions, the materials had to provide both an accessible means for the average person to participate in the dialogue, but also enough information to satisfy people with specific interests or concerns. An extensive consultation brochure, including a detailed overview of the environmental and transport assessments was produced and video podcasts were created, interviewing the project leads on different topics, from ecology, to landscape architecture.
The team was also conscious of low levels of participation from young people during previous rounds of consultation. In anticipation of this, several initiatives were undertaken to capture their views, including an activity sheet sent to primary schools and a survey of secondary school students aged 11 to 18.
The consultation was a great success, nearly 2000 responses were received. The public webinars had a similar level of attendance as previous public exhibitions for the scheme and the feedback on our approach was overwhelmingly positive. The webinar Q&As were lively, with lots of questions asked and answered and, from analysis of the ages of people that submitted feedback using the website, these digital tools were not the barrier to older people that might have been expected.
Feedback received on the reservoir proposals demonstrated a high level of support, with 80 per cent of people completing the consultation feedback forms either strongly agreeing or agreeing with the proposals, and 90 per cent support from young people.
The feedback informed final design decisions as the planning application was prepared, including an access road route and design features to mitigate landscape impacts. Feedback was summarised and responded to in a ‘You said, we’re doing’ report. A design and access statement was also submitted with the planning application, charting the evolution of the design, as informed by engagement with stakeholders.
A stakeholder group was designed to bring a range of perspectives into an ongoing dialogue and build consensus through influence and shared ownership. This group has evolved as the scheme progresses to implementation stage, into two specialist groups - a Strategic Advisory Group and a Community Advisory Group - with a shared independent chair.
Our collaborative approach to stakeholder engagement won the CIEEM Best Practice Stakeholder Engagement Award in October 2021.
Creative and innovative stakeholder engagement
Creative Design, Atkins’ in-house creative and digital agency was a key partner in delivering a creative public consultation solution. In collaboration with Portsmouth Water, the Creative Design team created a visual narrative and strategy alongside a suite of creative and innovative public consultation material, bringing the largest reservoir project in the UK to life.
Our Creative Design team brought to life an emotive campaign illustration that showcased the beauty of the Havant Thicket Reservoir, a sanctuary for the local community and wildlife, and transformed the traditional consultation approach with materials including a digital interactive consultation brochure, mail-drop brochure, social media assets, a 3D visualisation taking the community on a virtual tour of the scheme and a stunning animation using the latest CGI technology. The suite of both creative and innovative communication pieces helped the local community to envision the plans for the reservoir.
These digital tools were essential to navigating what was an unprecedented situation and will provide an invaluable, viable option for consulting the public moving forward.
Interested? Find out more about life at AtkinsRéalis
Sign up to receive the latest content tailored to your interests
Our articles
Preview
Middle EastContent type
BlogsPublish date
04/26/2024
Summary
By implementing reforms in the public sector and wider society, the KSA’s Vision 2030 has greatly improved government efficiency, bringing about new growth and investment opportunities. What is Visio
Preview
IndiaContent type
BlogsPublish date
04/25/2024
Summary
In the ever-evolving landscape of professional endeavours, finding a workplace that feels like your safe space is a rare gem. AtkinsRealis stands as a beacon in this regard, where talents not only
Preview
IndiaContent type
BlogsPublish date
04/25/2024
Summary
In the ever-evolving landscape of urban drainage modelling, AtkinsRéalis stands as the leaders with large highly skilled urban drainage modellers. Our focus on serving our clients around urban dra
Preview
CanadaContent type
BlogsPublish date
04/25/2024
Summary
Since the start of the COVID-19 pandemic, the skill of managing constantly changing environments has become more and more important. New construction project management software offers innovativ
Preview
AustraliaContent type
BlogsPublish date
04/24/2024
Summary
In a momentous shift, SNC-Lavalin has transitioned to AtkinsRéalis, marking a new era of innovation, collaboration, and excellence in engineering consultancy. With this rebrand comes a fresh persp
Preview
IndiaContent type
BlogsPublish date
04/23/2024
Summary
As Mumbai continues to evolve and expand, the demand for sustainable infrastructure and cutting-edge technology has never been more pressing. At the forefront of this transformative journey is Atk
Preview
EuropeContent type
BlogsPublish date
04/22/2024
Summary
Hi there! I'm Paul, a civil engineer with over 25 years of experience specializing in networks and drainage engineering. My role at AtkinsRéalis spans managing projects, directing major initia
by
Shailaja Mantha
Preview
EuropeContent type
BlogsPublish date
04/22/2024
Summary
Meet Paul, a talented civil engineer in water management whose career journey is as inspiring as impressive. Starting at AtkinsRéalis, fresh out of university in 1997, Paul quickly distinguish
by
Shailaja Mantha
Preview
Middle EastContent type
BlogsPublish date
04/18/2024
Summary
In the vast expanse of the Saudi Arabian landscape, you’ll find a beacon of innovation, a vision for a better, greener tomorrow. NEOM sits in the heart of the Tabuk province and isn’t just anothe
Preview
AsiaContent type
BlogsPublish date
04/18/2024
Summary
As a global metropolis, Hong Kong has long been a fantastic place to be a civil engineer. With world-class infrastructure all around, effective civil engineers have many opportunities to be a
Preview
AustraliaContent type
BlogsPublish date
04/18/2024
Summary
In January 2024, Srijana embarked on a new chapter in her engineering career, joining AtkinsRealis as a Chartered Structural Engineer. With six years of experience on a wide variety of projects, Sr
Preview
EuropeContent type
BlogsPublish date
04/17/2024
Summary
I'm Dean, Regional Director at AtkinsRéalis since July 2023. I'm a Chartered Quantity Surveyor in the Projects & Programme Services team with director-level experience across various sectors,
by
Shailaja Mantha
AtkinsRéalis
Equality, diversity and inclusion
We’re devoted to growing the diversity of our people, promoting an inclusive culture, providing everyone with an equal voice because simply put, it’s the right thing to do. Click to learn more.
Find out more